13. Heating, heating equipment
name-brand, downflow gas furnace to provide heating and warm water. (instalation of 60 l hot water tank at extra cost)
White colored plate radiators, with thermostat. This will be installed according to
the calculated energy requirements of the building.
Under floor heating, air conditioning and ventilation technology available at extra cost.
14. Water
Installation of water- and sewage pipes, according to needs.
15. Gas
The gas pipes are installed from the meter (if there is one in the building) to the furnace.
(Connection to external utilities – water, gas, sewage – is available at extra cost.)
16. Base slab
Ground floor:
Base slab
pipes and conduits (based on preliminary mechanical plans)
1 layer of insulation boards
heat-insulation
Attic:
Floor slab
Technological insulation (PE foil)
Sound insulation
17. Covering work, covering materials
The buyer chooses the covering materials on the ground level and in the loft:
Restroom / lavatory: Tiling – without moulding – up
to door-height
Tiles in an isometric pattern
Guest lavatory: Tiling up to door-height
Tiles in an isometric pattern
Kitchen: 60 cm wide Mirror tiles
Tiles in an isometric pattern
Rooms: Wall-to-wall carpeting, laminated parquet, or
Tiles in an isometric pattern
Terrace: Freeze-resistant tiles, placed in an isometric pattern
Stairs: Freeze-resistant tiles, placed in an isometric pattern
Moulding, diagonal tiling available at extra cost.
18. Installation of sanitary block
Appropriate quality and quantity, based on the type of building.
19. Painting- and wallpapering work
Interior/exterior coating with chosen color.
Smoothing and 2 part emulsion painting in pastel color.
(other colors available at extra cost)
20. Inside doors
Wooden or plastic, no door-sill. Choice of style and design.
21. Electrical outfitting
Installation of white, Prodax brand switches and outlets.
Verification of shock-protection and preparation of appropriate report.
|